View the program in our Progressive Web App
Program for stream Lot Sizing, Lot Scheduling and Production Planning
Sunday
Monday
Tuesday
Tuesday, 14:30-16:00
TD-23: Lot Sizing I - Stochastic Models
Stream: Lot Sizing, Lot Scheduling and Production Planning
Room: SOUTH BUILDING UV S305 (building 0)
Chair(s):
Roberto Rossi, Mengyuan Xiang
-
Multi-echelon multi-product capacitated lot-sizing problem with lead time and uncertain demand
Simon Thevenin, Yossiri Adulyasak, Jean-François Cordeau -
Safety stock allocation under capacity constraints and customer-specific service-times in multi-echelon inventory routing
Sebastian Malicki, Stefan Minner -
Solving the integrated lot-sizing and cutting stock problem under demand uncertainty
Eduardo Curcio, Vinícius Loti de Lima, Flávio Keidi Miyazawa, Elsa Silva, Pedro Amorim -
An efficient heuristic for joint replenishment problems
Mengyuan Xiang, Roberto Rossi, Belen Martin Barragan
Wednesday
Wednesday, 8:30-10:00
WA-23: Lot Sizing II - Heuristics
Stream: Lot Sizing, Lot Scheduling and Production Planning
Room: SOUTH BUILDING UV S305 (building 0)
Chair(s):
Bernardo Almada-Lobo
-
A two-phase approach for the parallel machine capacitated lot-sizing and scheduling problem with shared resources
Jesica de Armas, Manuel Laguna -
Sandwich approximation algorithms for lot-sizing problems
Wilco van den Heuvel, Guillaume Goisque, Christophe Rapine, Albert Wagelmans -
Fast heuristic for creating (online) production plans for the capacitated lot-sizing problem
Christian Almeder -
Matheuristcs for capacity planning at the glass container industry
Bernardo Almada-Lobo, Flaviana Moreira de Souza, Márcio Silva Arantes, Cláudio Fabiano Motta Toledo
Wednesday, 10:30-12:00
WB-23: Lot Sizing III - Remanufacturing
Stream: Lot Sizing, Lot Scheduling and Production Planning
Room: SOUTH BUILDING UV S305 (building 0)
Chair(s):
Onur Kilic
-
A MILP model for closed loop production planning in the automotive industry: a case study
Julien Maheut, Angel Ruiz, José P. Garcia-Sabater -
Perishability in integrated procurement and reprocessing planning of reusable medical devices in hospitals
Steffen Rickers, Florian Sahling -
Six sigma methodologies in airline operations
Ramesh Bollapragada -
The economic lot sizing problem with remanufacturing: new structural properties and polynomial-time heuristics
Onur Kilic, Wilco van den Heuvel
Wednesday, 12:30-14:00
WC-23: Lot Sizing IV - Integrated Models
Stream: Lot Sizing, Lot Scheduling and Production Planning
Room: SOUTH BUILDING UV S305 (building 0)
Chair(s):
Nabil Absi
-
A mathematical programming approach to product line decisions
Xavier Andrade, Luis Guimarães, Gonçalo Figueira -
Decomposition of sequence dependent setup times in simultaneous lot sizing, scheduling, workforce, overtime and shift planning
Gorkem Yilmaz, Cevdet Utku Şafak -
A simple heuristic for the supply vehicle routing and lot sizing problem enhanced by genetic programming
Fanny Hein, Christian Almeder -
Comparing sequential and integrated approaches for the production routing problem
Nabil Absi, Claudia Archetti, Stéphane DAUZERE-PERES, Dominique Feillet, M. Grazia Speranza
Wednesday, 14:30-16:00
WD-23: Lot Sizing V - Extensions
Stream: Lot Sizing, Lot Scheduling and Production Planning
Room: SOUTH BUILDING UV S305 (building 0)
Chair(s):
Nadjib Brahimi
-
Dynamic lot-sizing in a reverse logistics environment
Aaron Luntala Nsakanda, Moustapha Diaby -
A lot-sizing problem in deliberated and controlled co-production systems
Z. Caner Taşkın, Bahadir Pamuk, Semra Agrali -
Valid inequalities for the proportional lot-sizing and scheduling problem with fictitious micro-periods
Waldemar Kaczmarczyk -
Solving a lot sizing problem with lead time sensitive demands
Nadjib Brahimi, Adam Ferreira, Ramzi Hammami