2245. Multiobjective flowshop with additional resources during setups
Invited abstract in session WB-49: Flow shop scheduling problems, stream Lot Sizing, Lot Scheduling and Production Planning.
Wednesday, 10:30-12:00Room: M1 (building: 101)
Authors (first author is the speaker)
1. | Juan Camilo Yepes Borrero
|
Universidad Miguel Hernández | |
2. | Federico Perea
|
Departamento de Matemática Aplicada II, Universidad de Sevilla | |
3. | Justo Puerto
|
Estadistica e I.O., Universidad de Sevilla |
Abstract
This work investigates the flow shop scheduling problem with setup requirements and additional resources for setups from a multi-objective perspective. The setups required on machines after processing a job depend on the sequence, as well as the resources needed to perform them. The two objectives studied are minimizing the makespan and minimizing the additional resources used. Exact algorithms and metaheuristics are proposed to solve the problem. To evaluate the resolution methods, sets of non-dominated solutions obtained by each method are compared.
Keywords
- Scheduling
- Metaheuristics
- Multi-Objective Decision Making